About Thorium One Power
Thorium One Power is a development-stage energy infrastructure company. It develops behind-the-meter power and cooling-water campuses for gigawatt-scale AI data centers, with its first campus targeted in the Permian Basin of West Texas.
What the company does
Thorium One Power sells two things together, to one customer, behind one fence line: firm 24/7 electricity under a power purchase agreement, and distillate-quality cooling water under a take-or-pay water service agreement. The two contracts mirror each other, so a data center campus contracts its power and its cooling from a single accountable counterparty rather than assembling them separately.
The campus design pairs a 1.1 GW bridge fleet of natural gas generation with storage, targeting first power in 2028, with a molten-salt nuclear phase-in planned from 2033 that displaces gas on a published schedule. Cooling water — 10.4 million gallons per day at under 50 mg/L total dissolved solids — is produced by desalinating recycled oilfield produced water using the power island's own waste heat, so the campus withdraws zero freshwater.
| What it is | Development-stage energy infrastructure developer |
| What it sells | Behind-the-meter firm power (PPA) + cooling water (water service agreement) |
| Customer | Gigawatt-scale AI data center and hyperscale compute campuses |
| First market | Permian Basin, West Texas (ERCOT); site-flexible thereafter |
| Target first power | 2028, on a 1.1 GW bridge gas fleet with storage |
| Nuclear phase | Molten-salt modules planned 2033–37, vendor-neutral, never a condition of power delivery |
| Cooling water | 10.4 MGD desalinated from produced water; zero freshwater withdrawal |
| Stage | Pre-FID. Indicative schedule: reservation/LOI 2026, FID 2027, first power 2028–30 |
| Contact | contact@thoriumonepower.com |
What the name does and does not mean
This distinction matters commercially, not just semantically. An offtaker contracting with Thorium One Power is buying delivered megawatts and delivered gallons on dated obligations backed by liquidated damages — not exposure to a reactor development programme. The technology risk sits on the developer's side of the term sheet by design; see the risk allocation ledger.
Stage and what exists today
Thorium One Power is pre-FID and development-stage. The indicative schedule places capacity reservation and letters of intent in 2026, final investment decision and execution of the mirrored power and water agreements in 2027, and first power and first water in 2028–30, with the molten-salt nuclear phase-in following from 2033. Capacity for the first campus is being anchored around one or two counterparties.
Leadership, development partners and capital sources are reviewed under NDA as part of the offtaker and investor briefing packages. Campus capacity, water and date figures published on this site are targeted and indicative, subject to diligence and final engineering; the zero-freshwater design is structural rather than a target.
Common questions
What is Thorium One Power?
Is Thorium One Power a nuclear reactor company?
What does Thorium One Power sell?
What stage is Thorium One Power at?
Where is Thorium One Power located?